Steel Plant Finished Steel Warehouse Crane

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2025-05-27 23:10
Browse the number: 0
inquiry
Company Profile
 
 
Product details
The crane of heavy plate factory adopts double trolley, double main hoist structure or single trolley double main hoist structure. The crane of each main operation line is selected by single trolley mechanism, and the double crane structure is adopted for the crane of finished product storehouse. The mechanical part of the two winches on the trolley is directly connected with a long axis, so as to realize the mechanical synchronization of the two winches.
link:http://www.chinacranemanufacturer.com/steel-mill-crane/steel-mill-overhead-crane/steel-plant-finished-steel-warehouse-crane.html
Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]